CONSTRUCTION AND RECONSTRUCTION OF ELECTRICAL SUBSTATIONS “Naddnipryanskaya 150/10/6kV”, Dnipro
Construction of the first launch complex of the substation 150/10/6kV “Naddnipryanskaya” with power cable networks 150kV and reconstruction of adjacent grids 150kV:
150kV cable was laid: cross-linked polyethylene with a cross-section of 1,200mm² – 14,000m, a cross- section of 630mm² – 4,000m.
150kV cable was laid: cross-linked polyethylene with a cross-section of 1,200mm² – 14,000m, a cross- section of 630mm² – 4,000m.
PLACE, YEAR, DURATION
Dnipro, 2017, 9 months.
CUSTOMER
DTEK Dnipro Electric Networks, CJSC